We went to the dr on Monday, Feb. 15th for a check-up. Everything looks great! We had a quick ultrasound, which showed that Baby A is turned head down, but Baby B is transverse (laying sideways with his head on my right side and feet in the middle of my belly). They still have plenty of time to move around before it's time for their arrival. Baby A's heartrate was 137 and Baby B's was 142. A quick check of the cervix showed little to no risk of pre-term labor at this point, meaning no bed rest! We were very happy with this news. However, we didn't get any official measurements or any pictures on this visit.
We go back to the doctor every two weeks now, and the next appt on March 1st will be extra fun with a gestational diabetes screening and blood work in addition to the ultrasound. Keep your fingers crossed that I pass the gestational diabetes test...a restricted diet for me would be challenging to say the least!
Thursday, February 18, 2010
Sunday, February 7, 2010
Basement Progress & Snow
Jim and Kristian, our faithful basement helper, carried the remaining drywall from the garage to the basement...even with all of the snow on the ground! Thanks, Kristian!

Progress on the drywall continues, with Jim finishing the moisture-proof drywall in the bathroom and completing the hallway.
Progress on the drywall continues, with Jim finishing the moisture-proof drywall in the bathroom and completing the hallway.
Tuesday, January 26, 2010
Belly Growth
So...I guess it's been awhile since I've posted belly pics. But you can be sure that it has continued to grow! Here are the latest pics:
19 weeks
Adventures in Drywall
Jim has been very productive in getting the drywall up. The ceilings are nearly completed and he has gotten most of the upper pieces on the outer walls hung. It's really starting to come together!
Bedroom
Tuesday, January 12, 2010
Baby BOYS!!
Well, today was the big day! We had our 20 week ultrasound and found out that we are having two baby boys! They were both very active and healthy, with each weighing around 14 oz. We are so pleased that everything looked great! Here are some pics from the ultrasound:
Twin A profile
Sunday, January 10, 2010
Insulation & Drywall
This week, Jim completed the insulation in the basement. On Saturday, he and Kristian carried almost all of the drywall around the house from the garage into the basement (thanks, Kristian!). The drywall lift has been assembled and has been a huge help! On Saturday and Sunday, we were able to get the drywall completed on the ceiling in the kitchen and pool table area.

Friday, January 1, 2010
Basement and Living Room mantle
Jim has been very busy during his week off from work this week! We tiled a section of floor in the living room and moved the mantle (without the bulky base) onto it. We mounted our tv above it today. It looks great! Now all we are missing is the gas logs...hopefully the gas company will be out early next week to get everything hooked up for us so we can be toasty by the fire.
Before
The Tile Master 

In addition to the living room mantle, he also completed all of the plumbing work, finished boxing in all of the ducts and pipes on the ceilings and walls, and built the fireplace for the gas logs. It's definitely coming along!
Framing around pipes in exercise room
Plumbing in bathroom
Cut-off valves in utility closet
Plumbing to kitchen
Fireplace--we will have gas logs with rock on the remainder of this section of wall
Before
Mantle-before
Tile (pre-grout, which I did myself)
Finished product (almost)
Framing around pipes in exercise room