Tuesday, January 26, 2010

Belly Growth

So...I guess it's been awhile since I've posted belly pics. But you can be sure that it has continued to grow! Here are the latest pics:

19 weeks
21 weeks
22 weeks

Adventures in Drywall

Jim has been very productive in getting the drywall up. The ceilings are nearly completed and he has gotten most of the upper pieces on the outer walls hung. It's really starting to come together!

Bedroom
Living Room

Living Room/Kitchen

Living Room
Exercise Room

Tuesday, January 12, 2010

Baby BOYS!!

Well, today was the big day! We had our 20 week ultrasound and found out that we are having two baby boys! They were both very active and healthy, with each weighing around 14 oz. We are so pleased that everything looked great! Here are some pics from the ultrasound:

Twin A profile
Twin B profile
Already putting their heads together to stir up trouble!
Twin B on left and Twin A on the right.
Twin A 4-D
(with Twin B squeezing in at the bottom)
Twin B 4-D

Sunday, January 10, 2010

Insulation & Drywall

This week, Jim completed the insulation in the basement. On Saturday, he and Kristian carried almost all of the drywall around the house from the garage into the basement (thanks, Kristian!). The drywall lift has been assembled and has been a huge help! On Saturday and Sunday, we were able to get the drywall completed on the ceiling in the kitchen and pool table area.






Lexie & Hunter like hanging out in the basement :)
The drywall lift
The completed ceiling (kitchen and pool table area)

Friday, January 1, 2010

Basement and Living Room mantle

Jim has been very busy during his week off from work this week! We tiled a section of floor in the living room and moved the mantle (without the bulky base) onto it. We mounted our tv above it today. It looks great! Now all we are missing is the gas logs...hopefully the gas company will be out early next week to get everything hooked up for us so we can be toasty by the fire.

Before

Mantle-before
The Tile Master
Tile (pre-grout, which I did myself)
Finished product (almost)
In addition to the living room mantle, he also completed all of the plumbing work, finished boxing in all of the ducts and pipes on the ceilings and walls, and built the fireplace for the gas logs. It's definitely coming along!

Framing around pipes in exercise room
Plumbing in bathroom
Cut-off valves in utility closet
Plumbing to kitchen
Fireplace--we will have gas logs with rock on the remainder of this section of wall