Jim installed all of the recessed lights last week (over 20 in all!) and has ran the electrical wires to most of them.

The bar area in the kitchen has been built and all of the electrical boxes and light switches are in place.

Dad came up Saturday and helped run the circuits into the electrical box and installed the breakers while Jim and Kristian put in the new door (see below).

The lighting in these pictures isn't great, but it only opened on one side...

...and the wooden frame on the outside was rotting.

Here is the inside of the new door, which opens from both sides and is much better insulated.

The outside of the new door has a metal frame so it will not rot. Jim used plenty of spray foam to insulate all around the frame. This is before he scraped away the excess :) He still needs to frame around the outside of the door.